A representative report preview for an architectural drawing set. Customer files stay private; this sample uses fictional project details.

1 critical2 important18 checked references

Executive summary

InspectMind found three coordination issues that should be resolved before permit resubmittal. Each issue includes the affected sheets, the supporting evidence, and a recommended next action for the design team.

Critical

Roof overflow scupper elevation conflicts with parapet detail

A5.12 Detail 7, A2.03 Roof Plan
Evidence
The roof plan calls out overflow drainage at grid C/4, but the wall section shows the overflow opening above the stated emergency overflow elevation.
Recommended action
Align the scupper invert and parapet detail before permit resubmittal.
Important

Accessible restroom turning clearance is blocked by door swing

A1.21 Enlarged Plan, A6.02 Door Schedule
Evidence
The required turning circle overlaps the in-swing restroom door and the adjacent casework footprint.
Recommended action
Revise the door swing or fixture layout and confirm clear floor space.
Important

Electrical panel clearance is missing at corridor millwork

E2.10 Power Plan, A7.04 Millwork Elevations
Evidence
Panel EP-2 is shown behind full-height storage millwork with no dedicated working clearance noted.
Recommended action
Coordinate the panel location with architectural millwork before IFC release.